冷卻塔風(fēng)機(jī)的電動(dòng)機(jī)是長(zhǎng)期在濕熱環(huán)境下工作,為了保證其絕緣性能,不發(fā)生電動(dòng)機(jī)燒毀事故,每年必須做一次電動(dòng)機(jī)絕緣情況測(cè)試;
Cooling tower fan motor is working under hot and humid environment for a long time, in order to guarantee its insulation performance, not motor burning accident, must do once a year motor insulation test;
如果達(dá)不到要求,不僅影響冷卻塔,更直接影響到水冷式冷水機(jī)無法正常工作,因此要及時(shí)處理或更換電動(dòng)機(jī)。
If can not meet the requirements, not only affect the cooling tower, even directly affect the water cooled chiller cannot work normally, so should be handled in a timely manner or replace the motor.
如果冷卻塔是使用齒輪減速裝置,那么每一個(gè)月停機(jī)檢查一次齒輪箱中的油位,油量不夠時(shí)要補(bǔ)加到位;此外,冷卻塔每運(yùn)行六個(gè)月要檢查一次油的顏色和黏度,
食品冷庫(kù)達(dá)不到要求必須全部更換;
If the cooling tower is to use gear speed reducer, then every month check the oil level in gearbox, downtime was insufficient oil should be added in place; In addition, the cooling tower run every six months to check the color and viscosity of oil, not meet all requirements must be replaced;
當(dāng)冷卻塔累計(jì)使用5000h后,不論油質(zhì)情況如何,都必須對(duì)齒輪箱做徹底清洗,并更換潤(rùn)滑油,確保冷卻塔能夠?yàn)槔渌畽C(jī)提供循環(huán)不斷的冷卻水。
After the use of cooling tower is 5000 h, no matter how is oily, must do a thorough cleaning for gear box, and replace the lubricating oil, ensure that the cooling tower can provide cold water machine cycle cooling water.