物流冷庫在安裝過程中需要注意的幾點細節問題:
Cold storage logistics during the installation process need to pay attention to some details:
1、冷庫拼裝不同從而導致冷庫板的構成不同,所以大家在安裝冷庫的時候一定要參照冷庫拼裝圖來進行拼裝,以免庫板裝錯地方,引起不必要的麻煩。
食品冷庫
1, cold storage, assemble different leading to cold storage board composition is different, so everyone at the time of installation of cold storage must refer to cold storage assembly diagram for assembling, so as to avoid the wrong library board, cause unnecessary trouble.
2、冷庫掛鉤要完美結合。冷庫掛鉤是冷庫結合在一起的重要部件。在上掛鉤的時候應緩慢均勻用力,擰至板縫合攏,不可用力過度,以免鉤盒拔脫,導致庫板之間縫隙較大。
2, cold storage hook to perfect combination. Cold storage link is an important part of a refrigerator unifies in together. In the hook should be slow when firstly, twist to the plate suture approach, not overexert, lest josephalbert hook box, lead to bigger gap between library board.
3、在安裝冷庫庫板的時候一定要注意在搬運庫板的時候切不可庫板與庫板之間碰撞,這樣會對庫房的整體美觀帶來很大的影響。
3, at the time of installation of cold storage library board must pay attention to when handling library board must not collision between base plate and base plate, it will overall aesthetics brings great impact to warehouse.
4、在庫房搭建完畢之后,要全面檢查是否有些地方庫縫過大,要及時充填硅膠封閉。安裝風機和吊桿洞和電線洞都需要打上密封膠。
4, after the warehouse set up to full check whether some DeFangKu seam is too large, the silicone seal in time. Install the fan and derrick hole sealing glue and wire hole needs to be.
本文由
食品冷庫設備有限公司向大家友情奉獻.更多有關的知識請點擊:
http://www.sddslk.com/我們將傾情為您解答.