吊裝時根據排管長度重量確定吊點數量和位置,起吊前應預先將樓板上預埋螺栓校正好。排管的吊裝應由一人智慧,動作一致,以保證整體排管水平上升。當排管上升到預定位置時,上好預埋螺母.
The number and location of the lifting points should be determined according to the weight of the row length before lifting. The pre embedded bolts should be corrected in advance before lifting. Hoisting should be done by one person with wisdom and action so as to ensure the overall level of platoon management rises. When the row pipe rises to a predetermined position, a good embedded nut is placed.
排管吊裝的螺栓,在擰緊螺母后應伸出螺母四個螺距,在擰緊螺栓時校正排管的水平及坡度。排管的水平和坡度可在吊裝螺栓處加墊圈來調整。
Bolts for hoisting pipes should be extended after tightening the nut. The four pitch of the nut should be extended, and the level and slope of the pipe should be corrected when the bolt is tightened. The level and slope of the pipe can be adjusted with the washer at the lifting bolt.
蒸發排管通常采取整體吊裝。當蒸發面積較大時,其本身的剛性較差,為避免吊裝時發生的變型,必須采取加固措施。加固的方法除按樣圖規定安裝好各排管的角鋼支教和吊裝支架外,在排管底部還要利用槽鋼或工字鋼再做一吊裝托架。
The evaporating tube is usually hoisted as a whole. When the evaporation area is large, its rigidity is poor. In order to avoid the deformation during lifting, it is necessary to take reinforcement measures. In addition to the installation of corner steel support and hoisting support of each row of pipes according to the sample drawing, it is also necessary to make use of channel steel or I-steel at the bottom of the pipe to do a hoisting bracket.
排管的安裝有一定的基本技術要求,墻排管中心與墻壁內表面間距離不小于150mm,頂排管中心(多層排管為上層管子中心)與庫頂距離不小于300mm.
There are some basic technical requirements for the installation of the pipe row. The distance between the wall row center and the inner surface of the wall is not less than 150mm, and the center of the top row tube (the multilayer pipe is the upper pipe center) and the distance from the top of the library is not less than 300mm.
(1)步驟:連接水管→鋪設加熱絲→檢查水泄漏→絕熱
(1) steps: connect the water pipe, lay the heating wire, check the water leakage, adiabatic.
(2)管道安裝前必須將管內的污物及銹蝕清除干凈,安裝停頓期間對管道開口應采取封閉保護措施。
(2) the contaminants and rust must be removed before installation of pipelines. Closed protection measures should be adopted for pipeline openings during installation.
(3)排水管在庫內有效距離越短越好,水平管應坡向排水口坡度為1/100至1/50.
(3) the shorter the effective distance of the drainage pipe in the reservoir is, the better the slope of the horizontal pipe should be from 1/100 to 1/50..
以上便是醫藥冷庫今天的分享,您還滿意嗎,歡迎關注我們的網站:http://www.sddslk.com并且關注我們的產品,我們將為您提供優良的產品,衷心的愿與您建立合作關系。
The above is the sharing of medical cold storage today, are you satisfied, welcome to our website: http://www.sddslk.com and pay attention to our products, we will provide you with excellent products, and sincerely wish to establish a cooperative relationship with you.